Suspended ceiling installation guide
Recommended channel spacing: 500-800mm
Using either wire or rod to suspend.
Each channel comes with 3000mm in length. By joining the male side to the female side of the channel to extend its length to suit your project to guaranty a nice flush finish every time when joining channels together.
Step 1: Cut ceiling panels and slat into the right length.
Step 2: Press slats into the space between channel buckle.
Step 3: Press ceiling panels to channel buckle.
Step 4: For finishing around the edge use our slat, L or Groove shape trim (40×40 or 25×25).
Download Ceiling Install Guide Back to home page